Wenty Leagues Up-grade

Wenty Leagues Up-grade

Country

Australia.

State/City

Wentworthville NSW

Sector

Extension of carpark

Tasks

Site strip

Asphalt Preparation 

Installation of Asphalt

Site Supervisor for Civil works

Client

Effektiv

Status
  • Completed
Budget

$

Wenty Leagues Club Up-Grade

Along with delivering 780 new spaces, two passenger lifts will connect all levels for added convenience. The building is extremely well lit and is monitored by CCTV to ensure the safety and security for all our members and visitors. If you’ve driven along the Great Western Highway recently, you’ve no doubt seen the exciting spectacle that is a large multi-storey magpie that features on the corner of the structure.

 

Along with delivering 780 new spaces, two passenger lifts will connect all levels for added convenience. The building is extremely well lit and is monitored by CCTV to ensure the safety and security for all our members and visitors. If you’ve driven along the Great Western Highway recently, you’ve no doubt seen the exciting spectacle that is a large multi-storey magpie that features on the corner of the structure. 

Building of the first part of our multi-outlet casual dining precinct, The Plaza continues to remain on schedule. The framework for the roof line has been installed which will form level 1 of the building and will connect into the new main foyer and porte-cochere. Construction for this section will be completed in 2019.

As we lean into the warmer months of the year, every day sees new features added to both sites as the final structure continues to take shape. Hard work, good planning and consistent dry weather, has provided the opportunity for construction to pass well beyond the halfway point. The excitement is building as we get closer to officially unveiling the culmination of months of work.

In what was previously the undercroft carpark area adjacent to the main foyer, new administration, staff and back of house facilities have been successfully delivered. This will become significant to our members, as the original administration area currently occupies prime real estate on the rooftop level which in 2019 is scheduled for demolition. This will allow us to make way for a large function centre that will cater for all types of business and social events. This function space will contain two interconnecting rooms that can cater for 150 people or can open to cater for 300. There will be another two rooms which can cater for smaller groups of 50 people but can also open up to cater for 100. Along with state-of-the-art AV facilities, guests will be able to mingle in a pre-function lounge that will be located in the atrium space directly above the new main foyer.

The six-level multideck carpark is also nearing completion. The carpark is expected to be finalised prior to Christmas and will deliver 780 new spaces, of which 650 will be covered from the elements. Two passenger lifts will connect all levels for convenience and at time of print, the cladding is being installed for the front façade.

This façade will be an exciting spectacle as a large multistorey magpie will feature on the corner of the Great Western Highway entry driveway and be illuminated by signage proudly displaying the Wenty Leagues logo on multiple sides of the building.

Further to the good news, ADCO are on track to deliver Stage A of their building program in the first quarter of 2019. At this time, we will open the first part of our multioutlet casual dining precinct, The Plaza. This area will include numerous internal and alfresco dining options and seating for up to 850 people. An exciting feature currently being built is a unique roof line which will form level 1 of the building and connect into the new main foyer and porte-cochere. Construction for this section will be completed in 2019.

Project Brief

Atlas Earthworx was contracting to Effektiv Landscaping to supply a site supervisor and over see the civil works and making sure the civil work was in accordance with the Australian Standards.

  • Increase car park spaces
  • Well drained and clean surface          areas.
  • Site strip
  • Install asphalt
  • Quality control
The Result

The extension of the new Wenty Leagues will be delivering 780 new spaces, two passenger lifts will connect all levels for added convenience.

  • Six levels of parking
  • Generous line distances for               spaces
  • Significant turning room
  • Undercover walkway to club              entrance (to be built in 2019)